Minutes of the Port Council of 15/11/2021

17h, Port Council begins, without the presence of the mayor, retained at the Congress of Mayors of France. Are present(e)s: Mme/Mrs N.Jail, Garcia, Speak, Pascual, Christophe (of the harbor master's office), Labat, Roussille, Bourbennec, Badoc et Bocin .

First point of discussion: Peter Lambing, nav services 34, presents its location request to create professional premises (Diesel engines, Mechanical and electrical repairs) in Marseillan Plage, On the plot adjoining the launching side Robinson, Right after the new wave and Blue Pearl shipyard . He is warned of the high risk of flooding there but persists in his request . The municipality agrees to assume the digging of a trench and connections since it intended to set up public toilets on the site . Request unanimously accepted .

Point 2: Mr. Blanc requests an exemption to change her boat in the place that has just been allocated to her but it is refused after a long debate since it does not meet the criteria for the allocation of rings in the event of a boat sale, despite the seriously deteriorated health situation of the applicant. These criteria will be on the agenda of a next CP .

Point 3: The president of the APPM is appointed deputy member of Mr. Bourbennec, Marseillan association representative . As such, The APPM will now be a member of the CP law .

Point 4: The prices 2022 . The schedule proposed by the APPM having been adopted, The boaters are asked to respect the desired deadlines and pay the sums due in a balanced way (by dividing the total amount by 2 or 4 For example, so as to pay in 1, 2 or 4 identical sums) The central pontoon of the basin 2 must be replaced: 2 quote report a cost of 250 000 at 300 000 €, that the municipality can assume by voting an exceptional subsidy for security . After a lively discussion but mostly favorable to the final proposal it appears that an increase in 4% will be applied to the basin 1 to start "smoothing" the different contributions of 3 sites since the prices of the basin 1 are lower than 2 others (the basin 2 and Marseillan Plage), who will be increased by 2%, as for them . The arguments that I was able to oppose this increase proposal were swept by all the other participants . During the exchanges, It seems that the town hall has started a process to become the owner of the port, While she is only a dealer so far: giving the problematic financial situation for so many years, This approach can give rise to questions regarding real intentions and medium -term projects!

5th point: Changes to the Port Police Regulations: The baptisms of the diving school in Marseillan Plage are accepted in the port perimeter beyond the dike, outside the port in 300 meters.

Point 6: Complementary activities in Marseillan Plage . MICAPAPHA wishes to develop a school boat activity, They have the necessary rooms and patents: accepted . On the other hand Blue Pearl wanted to install a Sealoft (floating rental) which does not seem adapted here: refusal .

Point 7: Phar’o occupies without right or title part of the installations on the edge of his concession, which generates a conflict that turns out, Especially since Dolphin Nautico is about to be bought and the new buyers (which in particular propose to put into activity the avitaling in petrol) would not have access to water in the current abusive situation .

Point 8: The coastal surveillance project (Management of expected submersions / global warming / watershed) Subject to university, the Occitanie region and the Thau basin will be developed . Finally studies carried out within the University of Montpellier on the treatment of sludge collected in the port during a dredging make the possibility of using them as a road work, thus reducing the cost (very high) Dragages to come .

The session is lifted at 6.45 p.m. P/ APPM, Claude Bobin

Leave a Reply

Your email address will not be published. Required fields are marked *